On the Parsek Cost Estimation screen you prepare an estimate file for each project: items are grouped by work area, and each line holds item number, description, unit, quantity and unit price. Unit prices can be calculated with your own rates on the Unit Price Analysis screen.
A Wrong Estimate Means a Losing Project
A missing item, a wrong quantity or an outdated unit price leads either to a loss with a low bid or to elimination with a high one. Keeping the estimate linked to the contract, with revisions and supporting analyses, reduces that risk.

Key Features
Project-Linked Estimate
The estimate file is linked to the project and contract and tracked by status.
Work Areas
Split items into work areas such as block, floor or trade; unassigned items are shown separately.
Item Lines
Item number, description, unit, quantity, unit price, total and man-hours.
Excel Import
Upload your existing estimate table with İçe Aktar.
Revisions
Keep versions of the estimate and compare changes.
Unit Price Analysis Link
Jump from the estimate to Unit Price Analysis; see the analysis on each line and download the approximate cost as Excel. Details
How It Works
Try this free for 14 days. No credit card required.
Try Now →1. Create an estimate
In the app go to Proje Yönetimi › Yaklaşık Maliyetler, pick the project and create a new estimate.
2. Enter items
Add work areas and enter item lines manually or import them from Excel.
3. Price them
Enter unit prices or calculate them from your rates with Unit Price Analysis; download the approximate cost as Excel.
Frequently Asked Questions
Are ministry unit prices included?
No. You enter items and prices yourself or import them with Excel from a file you have the right to use.
Can I import my Excel estimate?
Yes. Upload your table with İçe Aktar and map the columns.
Can I keep several estimate versions?
Yes. Revisions keep earlier versions of the estimate for comparison.
An Organized Estimate, Justified Prices
Keep items, revisions and unit price analyses on the same project.