Permit steps, wastewater samples and limit checks.
Try Now →Permits & Environment runs building and workplace permits step by step. Wastewater sample results are compared with lower and upper limits; if a limit is exceeded, a draft penalty is calculated from the rule table. The penalty becomes final with a board decision and a notice date.